76.5 MW Yuzhne Energy Wind Power plant started back in 2020, and was fully commissioned in August 2021. Yuzhne Energy WPP is located near the town of Yuzhne in Lymanskyi district, Odesa region, and comprises 17 x Nordex N149/TS125 wind turbines.

It should be noted that the project has been slowed downed due to the COVID-19 pandemic and the related quarantine caused delays in the construction progress and installation works. All sanitary and epidemiological measures recommended by the Ministry of Health of Ukraine were implemented.

The expected annual clean electric power of the project could support around 44,000 household consumption, and will reduced carbon emissions by approximately 212,000 tonnes, which will contribute to achievement of Ukraine’s energy independence and improvement of clean energy ratio.

Power: 76.5 MW
Location: Odesa, UKRAINE
Date: 2020
Manufacturer: Nordex Acciona
Scope: Installation
Contribution to nature: 212.000 tonnes