The Susurluk Wind Farm, located in Balıkesir, involved a unique turbine relocation project. Originally, one turbine was situated in the path of a new highway under construction. To accommodate the development, we successfully relocated the turbine within the same site.
Our team took full responsibility for the crane operations, uninstallation, and reinstallation of the turbine. The relocation process was complex, given the challenging terrain and the need to ensure minimal downtime. Thanks to our skilled team, we were able to reposition the turbine efficiently while maintaining the wind farm’s overall energy output.
The Susurluk Wind Farm continues to contribute to Turkey’s renewable energy goals and showcases our ability to solve logistical and technical challenges in innovative ways.
Location: | Balıkesir, TURKIYE |
Date: | 2016 - 2017 |
Manufacturer: | Nordex |
Scope: | Relocation (Crane, Uninstallation, Reinstallation) |