Çakıl WF, TURKIYE

Çakıl WF, TURKIYE

The Çakıl Wind Farm, located in Yalova, Turkey, consists of 7 Enercon wind turbines with concrete towers, commissioned between 2019 and 2020. This project was carried out under a full-scope contract, including transportation, crane operations, and installation.

Concrete tower projects require specialized logistics and assembly methods, and our team successfully delivered all components and completed the installation under challenging site conditions. The Çakıl Wind Farm reflects our expertise in managing complex turbine technologies and delivering high-quality service across all phases of wind farm construction.

Power: 31 MW
Location: Yalova, TURKIYE
Date: 2019 - 2020
Manufacturer: Enercon
Scope: Full Scope (Transport, Crane, Installation)
img

To learn more about how we can help you

Contact us